{"id":712,"date":"2016-06-21T19:20:22","date_gmt":"2016-06-21T16:20:22","guid":{"rendered":"http:\/\/www.infrapro.com\/en\/%d0%bf%d1%80%d0%be%d0%b5%d0%ba%d1%82%d0%b8\/%d0%b8%d0%bd%d0%b6%d0%b5%d0%bd%d0%b5%d1%80%d0%bd%d0%be-%d0%ba%d0%be%d0%bd%d1%81%d1%83%d0%bb%d1%82%d0%b0%d0%bd%d1%82%d1%81%d0%ba%d0%b8\/"},"modified":"2021-11-16T12:02:01","modified_gmt":"2021-11-16T10:02:01","slug":"engineering-and-consulting","status":"publish","type":"page","link":"https:\/\/www.infrapro.com\/en\/projects\/engineering-and-consulting\/","title":{"rendered":"Engineering and Consulting"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]<\/p>\n<p style=\"text-align: justify;\">Infraproject Consult Ltd as a contractor of engineering and consulting services participates in a number of projects mainly in the transport sector for Sofia metro extension, financed by a loan from the Japan Bank for International Cooperation (JBIC), OP &#8220;Transport&#8221; 2007-2013 and &#8220;Transport and transport infrastructure&#8221; 2014-2020, as well as with financing from Sofia Municipality.<\/p>\n<p style=\"text-align: justify;\">The company is listed in the register of consultants for compliance assessment of investment projects and \/or construction supervision and has the right to exercise the activities of art. 166, para. 1, p. 1 SPA, technological rules and regulations necessary to provide effective and quality control in the implementation of the sites.<\/p>\n<p style=\"text-align: justify;\">Infraproject Consult Ltd provides:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Assessment compliance of investment projects with the essential requirements for construction works.<\/li>\n<li>Engineering and consulting services in the design and construction under the rules of FIDIC.<\/li>\n<li>Construction supervision of large infrastructure projects.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_empty_space][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/12&#8243;][vc_gallery type=&#8221;image_grid&#8221; images=&#8221;461&#8243; onclick=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;11\/12&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: justify;\"><strong>Consulting services and construction supervision during the design and construction of Struma Motorway Lot 3.1 Zheleznitsa Tunnel, Subdivision \u2116 2 from km 366 +720 to km 369 +000, including a service tunnel road at the Southern entrance of Zheleznitsa Tunnel and a helicopter pad (2019 \u2013 2021)<\/strong><\/p>\n<p style=\"text-align: justify;\">As a partner in &#8220;Plan Invest Zheleznitsa&#8221; DZZD in cooperation with &#8220;Plan Invest Plovdiv&#8221; EOOD, &#8220;Infra Control&#8221; EOOD, &#8220;Askos 03&#8221; EOOD and Search Corporation SRL (Republic of Romania), the company participates in the performance of engineering consulting services under Yellow FIDIC in the design and construction of Subdivision \u2116 2 from km 366 +720 to km 369 +000, including a service tunnel road at the Southern entrance of Zheleznitsa tunnel with a length of 2 km and a helicopter pad.<\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/www.infrapro.com\/en\/?page_id=1747&amp;preview=true\">CONTINUE READING<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;peacoc&#8221; style=&#8221;shadow&#8221; border_width=&#8221;3&#8243; css=&#8221;.vc_custom_1481290496960{margin-top: 10px !important;margin-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/12&#8243;][vc_gallery type=&#8221;image_grid&#8221; images=&#8221;461&#8243; onclick=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;11\/12&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: justify;\"><strong>Sofia Metro Extension Project, Third metro line &#8211; Blvd. &#8220;Botevgradsko shose&#8221; &#8211; Blvd. &#8220;Vladimir Vazov&#8221; &#8211; Central city part \u2013 Ovcha kupel residential area; First stage &#8211; 7,8 km metro lines and 8 metro stations (2015 &#8211; 2020)<\/strong><\/p>\n<p style=\"text-align: justify;\">The company provides consulting services as a partner of &#8220;Metrokonsult BG&#8221;, &#8220;Infram&#8221; JSC and &#8220;Infram&#8221; Ltd in a JV &#8220;IMI&#8221; &#8211; Consultant (Construction Supervision). The project is divided into sections and stations in four separate lots: &#8230;<\/p>\n<p style=\"text-align: justify;\"><a class=\"read-more header-font\" href=\"https:\/\/www.infrapro.com\/en\/projects\/engineering-and-consulting\/sofia-metro-project-iii-metrodiameter\/\">CONTINUE READING<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;peacoc&#8221; style=&#8221;shadow&#8221; border_width=&#8221;3&#8243; css=&#8221;.vc_custom_1481290496960{margin-top: 10px !important;margin-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/12&#8243;][vc_gallery type=&#8221;image_grid&#8221; images=&#8221;461&#8243; onclick=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;11\/12&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: justify;\"><strong>Sofia Metro Extension Project, Second metro line &#8211; Section from MS James Boucher to MS Vitosha with a linear point \u2013 1.3 km metro lines and one underground metro station (2013-2016)<\/strong><\/p>\n<p style=\"text-align: justify;\">In association with Metrokonsult BG the company provided engineering and consulting services in design and construction, including &#8230;<\/p>\n<p style=\"text-align: justify;\"><a class=\"read-more header-font\" href=\"https:\/\/www.infrapro.com\/en\/projects\/engineering-and-consulting\/sofia-metro-second-metro-diameter\/\">CONTINUE READING<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;peacoc&#8221; style=&#8221;shadow&#8221; border_width=&#8221;3&#8243; css=&#8221;.vc_custom_1481290496960{margin-top: 10px !important;margin-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/12&#8243;][vc_gallery type=&#8221;image_grid&#8221; images=&#8221;461&#8243; onclick=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;11\/12&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: justify;\"><strong>Consulting engineer of: Sofia metro extension Project, First metro line, Stage III, Lot 2 &#8211; Section from MS 13 (Mladost I) up to MS 16 (Business Park, Mladost IV) \u2013 2.7 km metrolines with 3 underground stations (2013-2015)<\/strong><\/p>\n<p style=\"text-align: justify;\">The company participates as a partner of &#8220;Metrokonsult BG&#8221; in association &#8220;MIK&#8221; &#8211; Consultant (Construction Supervision). The scope of work of the consulting engineer services:<\/p>\n<p style=\"text-align: justify;\"><a class=\"read-more header-font\" href=\"https:\/\/www.infrapro.com\/en\/projects\/engineering-and-consulting\/sofia-metro-first-metro-diameter-stage-iii\/\">CONTINUE READING<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;peacoc&#8221; style=&#8221;shadow&#8221; border_width=&#8221;3&#8243; css=&#8221;.vc_custom_1481290496960{margin-top: 10px !important;margin-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/12&#8243;][vc_gallery type=&#8221;image_grid&#8221; images=&#8221;461&#8243; onclick=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;11\/12&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: justify;\"><strong>Engineering and consulting services in the design and construction of: Sofia Metro Extension Project &#8211; II diameter; Section: &#8220;Road junction Nadezhda \u00a0&#8211; Central Railway Station &#8211; Sveta Nedelya Sq \u2013 National Palace of Culture \u2013 Cherni vrah Blvd&#8221;, comprising of 6 km of metro lines, 7 metro stations and 2 underground parkings and reconstruction of existing infrastructure (2008-2012)<\/strong><\/p>\n<p style=\"text-align: justify;\">As a partner in the consortium &#8220;Systra &#8211; Infraproject Consult &#8211; Metrokonsult BG&#8221; &#8211; and Engineer Consultant of the project, Infraproject consult participated in &#8230;<\/p>\n<p style=\"text-align: justify;\"><a class=\"read-more header-font\" href=\"https:\/\/www.infrapro.com\/en\/projects\/engineering-and-consulting\/sofia-metro-ii-diameter\/\">CONTINUE READING<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;peacoc&#8221; style=&#8221;shadow&#8221; border_width=&#8221;3&#8243; css=&#8221;.vc_custom_1481290496960{margin-top: 10px !important;margin-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/12&#8243;][vc_gallery type=&#8221;image_grid&#8221; images=&#8221;461&#8243; onclick=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;11\/12&#8243;][vc_column_text]<strong>Sofia Metro Extension Project \u2013 I<sup>st<\/sup> Metro line (2002 &#8211; 2011)<\/strong><\/p>\n<p style=\"text-align: justify;\">As a subcontractor of PADECO and PCI, Japan, with main counterparty Sofia Municipality and in cooperation with the companies \u201cMetroproekt 2000\u201d Ltd and &#8220;Metrokonsult BG&#8221; Ltd, &#8220;Infraproject Consult&#8221; Ltd is involved in: &#8230;<\/p>\n<p style=\"text-align: justify;\"><a class=\"read-more header-font\" href=\"https:\/\/www.infrapro.com\/en\/projects\/engineering-and-consulting\/sofia-metro-ist-metro-diameter\/\">CONTINUE READING<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;peacoc&#8221; style=&#8221;shadow&#8221; border_width=&#8221;3&#8243; css=&#8221;.vc_custom_1481290496960{margin-top: 10px !important;margin-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Infraproject Consult Ltd as a contractor of engineering and consulting services participates in a number of projects mainly in the transport sector for Sofia metro extension, financed by a loan from the Japan Bank for International Cooperation (JBIC), OP &#8220;Transport&#8221; 2007-2013 and &#8220;Transport and transport infrastructure&#8221; 2014-2020, as well as with financing from Sofia [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":579,"parent":705,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-tpl_left_sidebar.php","meta":{"footnotes":""},"class_list":["post-712","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages\/712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/comments?post=712"}],"version-history":[{"count":0,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages\/712\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages\/705"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/media\/579"}],"wp:attachment":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/media?parent=712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}