{"id":1397,"date":"2021-11-03T14:49:12","date_gmt":"2021-11-03T12:49:12","guid":{"rendered":"http:\/\/www.infrapro.com\/en\/?page_id=1397"},"modified":"2021-11-17T12:15:21","modified_gmt":"2021-11-17T10:15:21","slug":"analysis-of-the-variants-of-the-struma-motorway-route-lot-3-2-2019","status":"publish","type":"page","link":"https:\/\/www.infrapro.com\/en\/projects\/transport\/analysis-of-the-variants-of-the-struma-motorway-route-lot-3-2-2019\/","title":{"rendered":"Analysis of the variants of the Struma Motorway route Lot 3.2 (2019)"},"content":{"rendered":"<p><span style=\"color: #0a7eb7;\"><strong>Analysis of the variants of the Struma Motorway route Lot 3.2 (2019)<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1205 alignright\" src=\"http:\/\/www.infrapro.com\/wp-content\/uploads\/2021\/10\/Struma-Motorway-300x165.jpg\" alt=\"\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.infrapro.com\/wp-content\/uploads\/2021\/10\/Struma-Motorway-300x165.jpg 300w, https:\/\/www.infrapro.com\/wp-content\/uploads\/2021\/10\/Struma-Motorway-409x224.jpg 409w, https:\/\/www.infrapro.com\/wp-content\/uploads\/2021\/10\/Struma-Motorway-555x304.jpg 555w, https:\/\/www.infrapro.com\/wp-content\/uploads\/2021\/10\/Struma-Motorway-471x258.jpg 471w, https:\/\/www.infrapro.com\/wp-content\/uploads\/2021\/10\/Struma-Motorway.jpg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>The company provided consulting services to the Road Infrastructure Agency in connection with the financial phasing of a project for construction of the Struma Motorway, Lot 3.2 under the Operational Program &#8220;Transport and Transport Infrastructure&#8221; 2014-2020. The possibilities for financial phasing of the project, assistance and consulting of the Road Infrastructure Agency in connection with the development and approval of the project by JASPERS and the European Commission were analysed.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Analysis of the variants of the Struma Motorway route Lot 3.2 (2019) The company provided consulting services to the Road Infrastructure Agency in connection with the financial phasing of a project for construction of the Struma Motorway, Lot 3.2 under the Operational Program &#8220;Transport and Transport Infrastructure&#8221; 2014-2020. The possibilities for financial phasing of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":707,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-tpl_full_width.php","meta":{"footnotes":""},"class_list":["post-1397","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages\/1397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/comments?post=1397"}],"version-history":[{"count":0,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages\/1397\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/pages\/707"}],"wp:attachment":[{"href":"https:\/\/www.infrapro.com\/en\/wp-json\/wp\/v2\/media?parent=1397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}