Sofia Urban Transport Project, Stage I (2010-2011)

As a sub-contractor of consulting company ARUP UK, Infraproject Consult Ltd. prepared Cost-Benefit Analysis for the six project components in compliance with RD4 Guidelines to the methodology of preparation of Cost-Benefit Analyses of DG “Regional Policy”, EC 2007; Guide for Cost-Benefit Analysis of investment projects of the DG” Regional Policy”, EC 2008; Requirements for the preparation of cost-benefit analysis in the transport sector, adopted by Decision of the CM.